Guelph Metal Roof & Skylight Upgrade

Project Details:

  • Location: Bushmills Crescent, Guelph

  • Duration: 6 days

  • Roof Area: 1710 sq. ft.

  • Material: ThyssenKrupp 25-gauge G90 galvanized steel

  • Design: Monterey Metal Tile

  • Color: Red

  • Cost: 10,000-12,500 CAD

Project Overview

The homeowner bought this house about a year ago and wasn’t completely sure how much life was left in the shingles. After inspecting the roof, it was clear they were old and worn out. He decided to upgrade to a red metal roof instead of waiting for problems to show up. Since we were switching from shingles to metal, we also replaced the skylight so the entire system would be built properly from the start. The work was done during winter, so we had to move carefully and plan each step.

Project Challenges 

Winter conditions made timing and protection important. We couldn’t leave parts of the roof exposed, so we worked in stages and covered areas with tarps to keep snow out. The skylight was another key detail. The existing one was made for shingles, but metal roofing requires a different type of installation. It had to be rebuilt properly so the new roof would perform the way it should.

CALL NOW FOR YOUR FREE ESTIMATE

Installation Process

Stage 2: Skylight Replacement

We took the old skylight out and installed a new upraised frame using 2x8 wood for a curb-mounted skylight. The new skylight was installed properly on the curb with a membrane around the bottom and ready to be flashed. It is important to rebuild the skylight the correct way so that it will work with the metal roof rather than against it.

Stage 1: Double Wood Strapping & Protection

We began by installing double wood strapping to create a solid base for the metal panels. Because of the weather, we protected open sections of the roof with tarps while we worked. We also made sure there was a protective layer underneath the system, since we never install metal panels directly over exposed wood.

Stage 3: Temporary Winter Protection

Because the project took place in winter, we covered part of the roof with tarps after preparing the base to keep snow and moisture from getting underneath until we could continue the installation.

Stage 4: Metal Panel Installation

Once the structure and skylight were ready, we installed the red metal panels across the whole roof area. Each panel was secured carefully to ensure a straight layout. Extra attention was given around the skylight area to make sure the panels and flashing worked together for proper long-term protection.

Results

The house got the red metal roof, which gave it a new look and a long-lasting roof.  More importantly, the skylight was rebuilt the right way to match the metal system. Even with winter conditions, the project was completed carefully and without shortcuts. The homeowner now has a roof that’s built properly from the structure up.

Customer Review

Rating: .
One of the homeowners shared their experience in a Google review

5 stars from the homeowner

"

READY TO BECOME ONE OF OUR SATISFIED CLIENTS?

Let's Discuss Your Roof Project

1 416 857-7143

1368 Blundell Rd, Mississauga, ON L4Y 1M5

  • facebook
  • twitter
  • youtube

Fill out the form, or call us to get a free estimation or consultation

Other Projects

bottom of page