Phelpston 22-Year Roof Upgrade
Project Details:
-
Location: 10 Pine Hill Dr, Phelpston
-
Duration: 9 days
-
Roof Area: 3,650 sq. ft.
-
Material: ThyssenKrupp 25-gauge G90 galvanized steel
-
Design: Monterey Metal Tile
-
Color: Black
-
Cost: 25,000-28,000 CAD
Project Overview
The homeowners called MROOF because their 22-year-old shingle roof was worn out and leaking at a back dormer in the winter. The house is in the snow belt, so the roof had to handle harsh weather. Our objective was to improve the strength of the roofing system. We upgraded the waterproof protection and improved the ventilation to handle snow and moisture more effectively. At the homeowner’s request, we also added tie-off loops for safe future roof access.
Project Challenges
The main issue was a leak from the back dormer. The shingles were 22 years old and worn out. The house is in the snow belt, where winters are long and snow is heavy. We knew the new roof had to handle these conditions without problems. Strong waterproofing and proper ventilation were needed to prevent the leaks from coming back.
Installation Process
Stage 2: Membrane and Double Wood Strapping
We installed a synthetic waterproof membrane on the roof to protect the roof from any weather conditions: rain, snow, storm and so on. Then we added double wood strapping according to our technique. This created a strong base for the next step.
Stage 1: Roof Inspection
MROOF team inspected the old shingle roof. Then we found the leak by checking the back dormer. This step was very important as we have to clearly understand the plan of construction for this specific metal roof project.
Stage 3: Metal Panel Installation
We installed the metal panels using our technique. Each panel was aligned and secured properly.
Stage 4: Finishing Touches
We completed the final details on the roof such as ridge caps and snow stops. We also checked the ventilation system to make sure we solved the problem successfully. And by the homeowners request we also installed tie-off loops for safe future roof access.
Results
The water intrusion from the back dormer was fixed. The new roofing system now has strong waterproof protection and improved ventilation. The home is better prepared for heavy snow and harsh winter conditions. The homeowner now has a secure and reliable roof built to last.

Customer Review
Rating: .
5 stars from both homeowners
One of the homeowners shared their experience in a Google review
"
My wife and I got 8 quotes total, 4 shingle quotes and 4 metal roof quotes. We selected MRoofing as Viktor was very communicative during the quoting process. We had a lot of questions about the metal and materials used as it's a big investment. The roof took about a week from start to finish. The crew was excellent to deal with. The crew did a fantastic job installing our metal roof and the fit and finish around the 5 dormers is excellent. Highly recommend reaching out to Viktor before you commit to a shingle roof as my wife and I were surprised at the cost delta. Note, the tie off's we asked to be left in place encase we ever had to get on the roof.
READY TO BECOME ONE OF OUR SATISFIED CLIENTS?
Let's Discuss Your Roof Project
1 416 857-7143
1368 Blundell Rd, Mississauga, ON L4Y 1M5


















-min_JPG.jpeg)
-min_JPG.jpeg)
-min_JPG.jpeg)
-min_JPG.jpeg)